The inner stem has been cleaned up (excess epoxy removed) and screwed to the strongback and fixed to the mould at station 1 with a temporary bracket. I bevelled the front corners of the stem at 45 degrees so that there will be less material to remove when it is being faired.
Two temporary battens have been nailed to the moulds for support to keep them vertical. these will be removed or maybe lowered as the planking progresses.
No comments:
Post a Comment